+39 331 584 7291 [email protected] Mon-Fri 8:00-17:30 (CET)
Tower Construction  Spie Comcross

Tower Construction Spie Comcross

Browse technical resources about specialty optical cables, hybrid cables, waterproof patch cords, MPO/MTP, AWG WDM, 800G transceivers, testers, outdoor power cabinets, DCI, smart grid and industrial o...

  • Efficient Tools for Fiber Optic Construction

    Efficient Tools for Fiber Optic Construction

    This article provides a complete guide on how to choose the right fiber optic tools for professional installations, analyzing categories from cutting and splicing to cleaning, inspection, and testing. Fiber optic cables are essential components in modern data transmission infrastructure. They support high-speed, interference-resistant communication and are particularly effective in applications that require high bandwidth, low latency, and strong signal integrity. Unlike traditional copper or. An OTDR helps pinpoint faults, breaks, and splices along a fiber link with serious accuracy. Crucial for certifying new links or troubleshooting existing ones. Good OTDRs come with touchscreen interfaces, multiple wavelengths, and. Fiber broadband expansion demands precision, speed, and accountability at every phase of construction.


  • Cable Tray Construction in Norway

    Cable Tray Construction in Norway

    For the construction of Ertsmyra transformer station, Oglaend System delivered cable ladders and cable trays to most rooms and culverts in the facility. The station will be an integral part of the NordLink int.


  • 301 Bridge Construction

    301 Bridge Construction

    SMITHFIELD – Work to remove and replace the US 301 bridge spanning the Neuse River south of Smithfield will begin this spring, after the state highway department awarded a $9. During construction, the ex ast impactful and most cost eficient design. None of the alternatives incl ded a closure of the existing US 301. (September 20, 2022) – The Maryland Department of Transportation State Highway Administration (MDOT SHA) will begin a project Monday, September 26, to replace the northbound US 301 (Blue Star Memorial Highway) bridge over Chester River, south of the MD 291 overpass near Millington, in Queen Anne's. Replace 2 bridges along US-301 over N. Project is built mainly offline with new Roadway approaches including asphalt, drainage, curb and gutter, wet utilities.


  • On-site construction requirements for three-level distribution boxes

    On-site construction requirements for three-level distribution boxes

    Check for proper IP/NEMA ratings and material quality. Ensure safe placement: install in dry, accessible areas with good ventilation and at appropriate height (typically ~1. Practice good wiring: secure grounding, neat cable management, proper insulation, and correct wire gauge and. According to standards, the height from the bottom edge of a distribution box to the floor is generally 1. 5m, and for distribution boards, it should not be less than 1. However, this height can be adjusted higher or lower appropriately for operational and maintenance convenience, provided design. This manual is for electronic distribution only and is designed to provide you with the most current information on the Los Angeles Department of Water and Power's (Department) service equipment and installation requirements. Click on “Contents” at the top to view the contents page. The distribution box shall be made of iron plate or other fire-proof insulating materials to achieve ventilation, heat dissipation, rain proof and fire-proof.

    [PDF Version]
  • Price of grounding method for construction site electrical distribution box

    Price of grounding method for construction site electrical distribution box

    Typical costs for grounding an electrical panel depend on soil conditions, panel size, location, and whether a licensed electrician is required. The main cost drivers are labor time, ground rod or grounding conductor length, permits, and any trenching or concrete work needed. Grounding is something that must always be done by a professional electrician. It offers high levels of safety and quick fault response. When lightning strikes or a rogue voltage surge decides to crash the party, proper grounding steps in like a seasoned bouncer, redirecting danger away from. This report describes Phase I of a two-phase project to assess industry practices and standards for grounding and bonding of medium-voltage underground residential distribution (URD) and underground commercial distribution (UCD) circuits and worker safety in worksites with these systems.

    [PDF Version]

Need Product Pricing?

Contact us for competitive quotes on any of our fiber optic and telecom products

Get a Quote