+39 331 584 7291 [email protected] Mon-Fri 8:00-17:30 (CET)
Pacific Standard Time – Pst Time Zone

Pacific Standard Time – Pst Time Zone

Browse technical resources about specialty optical cables, hybrid cables, waterproof patch cords, MPO/MTP, AWG WDM, 800G transceivers, testers, outdoor power cabinets, DCI, smart grid and industrial o...

  • Optical power meter with ultra-long standby time

    Optical power meter with ultra-long standby time

    These handheld optical power meters feature a large LCD display, 240-hour standby, user calibration, and energy-saving features. Compatible with rechargeable and alkaline batteries, perfect for long-term testing. Keysight optical power meters measure optical signal strength, providing multi-channel measurement processing and system control while offering rapid response times, wide dynamic range, and simple integration into automated test setups. The offering ranges from a low cost, hand-held meter to the most advanced dual channel benchtop power meter available in the market. Our 1936-R/2936-R series boasts state-of-the-art analog boards with a whopping 250. Our LP1's are calibrated to 532 nm, but are also designed to read any other wavelength in the 400〜1100 nm range using a chart inside the case cover.


  • Optical Time Domain Reflectometer sH

    Optical Time Domain Reflectometer sH

    An optical time-domain reflectometer (OTDR) is an instrument used to characterize an. It is the optical equivalent of an electronic which measures the of the or under test. An OTDR injects a series of optical pulses into the fiber under test and extracts, from the same end of the fiber, that is scattered () or reflected ba.


  • Relay protection TPR time

    Relay protection TPR time

    A definite time over-current (DTOC) relay is a relay that operates after a definite period of time once the current exceeds the pickup value. Hence, this relay has current setting range as well as time setting range.OverviewIn, a protective relay is a device designed to trip a when a is detected. The first protective relays were electromagnetic devices, relying on coils operating on moving par. Electromechanical protective relays operate by either, or. Unlike switching type electromechanical with fixed and usually ill-defined operating voltage thresholds.


  • Activation time of electrical distribution boxes at construction sites

    Activation time of electrical distribution boxes at construction sites

    This process can take anywhere from 1-8 months depending on the local utility company and municipality or permitting authority, so make sure you start the process early on. This guidance is aimed at those responsible for planning and subsequent management, and those who control the installation and use of electrical systems and equipment on construction sites. If you have receptacles in damp or outright wet locations, you must use ground-fault circuit interruptors (GFCIs). But, it's not just about plugging in and getting to work. However, exposure to weather, frequent relocation, rough use and other condi-tions not normally encountered with conventional wiring systems necessitate special consideration not require in other applications or in completed structures.


  • How to wire the time switch in the distribution box

    How to wire the time switch in the distribution box

    To wire a modular timer switch on an electrical panel, follow 3 steps: (1) clip the timer onto the DIN rail and power it through a dedicated 2A circuit breaker with 1. 5 mm² wire, (2) wire the dry contact by routing the live wire of the appliance you want to control (water heater, lighting, pump. ). A distribution board or distribution box is where the main power supply is distributed to multiple loads. And all the switching and protective devices are installed in the distribution box. Single Phase Distribution Box generally consists of Double Pole MCBs, Single Pole MCBs, and RCCBs. Now it's time to connect the wires to the timer switch.


  • How long is the wiring in a capacitor bank at one time

    How long is the wiring in a capacitor bank at one time

    High-frequency voltage and current transients occur when switching a capacitor bank into service. The maximum voltage peak does not exceed (in the absence of harmonics) twice the peak value of the rated v.


Need Product Pricing?

Contact us for competitive quotes on any of our fiber optic and telecom products

Get a Quote